LINDA CEM berthed at El-Arish port in Egypt on the evening of Friday 30 October 2026 and began loading the cargo in bulk.
CEM I 42.5N is a Portland cement for general construction: structural concrete, foundations, precast elements and blocks. It travels in bulk and, in Libya, is stored and carried to projects by the group's own tankers.
LINDA CEM is 185 metres long, with a deadweight of some 34,000 tonnes. It works as a floating cement terminal for SESCO, one of the group's partners.





