Skip to content
All news

LINDA CEM loads 27,000 tonnes of cement for Libya

The vessel LINDA CEM berthed at El-Arish, Egypt, on 30 October 2026 to load 27,000 tonnes of CEM I 42.5N bulk cement for Libya.

LINDA CEM berthed at El-Arish port in Egypt on the evening of Friday 30 October 2026 and began loading the cargo in bulk.

CEM I 42.5N is a Portland cement for general construction: structural concrete, foundations, precast elements and blocks. It travels in bulk and, in Libya, is stored and carried to projects by the group's own tankers.

LINDA CEM is 185 metres long, with a deadweight of some 34,000 tonnes. It works as a floating cement terminal for SESCO, one of the group's partners.

For the press.

For interviews, photographs or more on our news, contact the group.